Karm Machine Tools logo
Karm Machine Tools
Stone processing machinery
6 → 41Daily users, week 1 to week 12
62% → 84%On-time despatch
₹18 lakhDead stock found at the first stock take

Karm Machine Tools: ERP on a 58-Person Shop Floor

From six daily users to forty-one on a floor that had never used software.

Gegal, Ajmer · Rajasthan12 weeks7 min readRead
BMI Cables logo
BMI Cables
Wires and cables
9 → 3Days to close the month
3.6% → 2.4%Copper scrap on the drawing lines
150+Spreadsheets it replaced

BMI Cables: 150 Spreadsheets to Manufacturing ERP

Month-end close from nine days to three, and quotations that no longer carry a three-week-old copper rate.

Khushkhera, Bhiwadi · Rajasthan6 to 7 months7 min readRead
Your plant next

Ask us the awkward
questions first.

Adoption, migration, what breaks in month two. Book a 30-minute walkthrough on a live instance and bring the hard ones.

FactoFor the True Industrialist.

Product

  • Manufacturing Software by Industry
  • Problems
  • Live Product
  • On the Floor
  • Solution
  • Industries

Company

  • About
  • Case Studies
  • Compare Manufacturing Software
  • Blog
  • Manufacturing Software Guide
  • Contact

Contact

  • [email protected]
  • +91 83840 75104
  • IndiaBengaluru · Delhi · Ahmedabad · Jaipur
  • USSan Jose
  • UAEDubai
© 2026 NEEV FACTO TECHNOLOGIES · All rights reserved.Privacy·Terms·RefundsMade in India · For Indian factories
Pull the cord