Solutions · Food processing

Manufacturing ERP built for a variable raw material

Your input quality changes with the season and the supplier, and your output has a date on it from the moment it is made.

  • First phase live in 8 to 12 weeks
  • Deployed by our own engineers
A typical line in food processing
  1. 01Receivingsupplier lot and weight
  2. 02Sorting and gradingquality grade per lot
  3. 03Processingbatch yield against the input
  4. 04Fillingfill weight and pack count
  5. 05Packingcartons with the batch code
  6. 06Despatchremaining shelf life
Illustrative. Facto is set up with your own steps and names.
01

What should a food manufacturer look for in an ERP?

Batch traceability that answers a recall in one query rather than in two days of spreadsheet work, shelf life driving which stock ships rather than sitting as a printed date, and yield measured per batch against a raw material whose quality genuinely varies by lot, season and supplier.

02

Five things that are different in food processing

Each one is true here and not in the other sectors we deploy in, so it changes how the system is set up from day one.

  1. Yield moves with the raw material, not with the process

    The same line, the same operators and the same settings produce different output from a different lot. Yield has to be measured per batch against the actual input, otherwise a supplier quality problem looks like a production problem and gets solved in the wrong place.

  2. Shelf life is a despatch constraint

    Stock is not interchangeable. What ships has to be chosen by remaining shelf life against what the customer will accept, which for organised retail is usually a contractual percentage. A stock figure with no date attached cannot answer that.

  3. Traceability has to run both ways, fast

    From a consumer complaint back to the batch, the shift and the supplier lot, and forward from a suspect lot to every customer who received it. FSSAI expects this and a recall does not wait for spreadsheet work.

  4. Weight and count are both real units

    Material arrives by weight, output ships by pack and by carton, and the conversion has its own losses at filling and packing. Booking both, and the loss between them, is where the real material cost sits.

  5. Hygiene and changeover eat capacity

    A line changeover between products involves cleaning, and that time is capacity you did not use. Booked as its own activity rather than averaged into the shift, it becomes a schedulable thing instead of an unexplained gap.

03

What we configure first for food processing

Live in 8 to 12 weeks
  1. 1

    Batch production and traceability

    Batch as the unit, forward and backward tracing between supplier lot, production shift and the customers who received the output, answerable as a query.

  2. 2

    Inventory and stores

    Shelf life driving despatch selection, weight and count both held with the conversion loss booked, and stock ageing visible before it becomes a write-off.

  3. 3

    Production planning and tracking

    Yield per batch against the actual input lot, with cleaning and changeover booked as their own activity so capacity conversations are based on real available time.

  4. 4

    Quality and traceability

    Checks recorded against the batch, so a complaint traces back to a shift and a supplier lot rather than to a date range.

04

Questions we get in food processing

Can Facto trace a food batch back to the supplier lot?

Yes, in both directions. From a finished batch back to the raw material lots and the shift that produced it, and forward from a suspect supplier lot to every customer who received output containing it, as a query rather than a reconstruction.

Does the system manage shelf life at despatch?

Remaining shelf life is held against the stock, so despatch selection can respect what a customer will accept rather than treating every carton as interchangeable. Ageing stock is visible before it becomes a write-off.

How is yield handled when raw material quality varies?

Yield is measured per batch against the actual input lot rather than against a standard. That separates a supplier quality issue from a production issue, which matters because the two get solved by completely different people.