Solutions · Textiles

Manufacturing ERP that keeps the lot and the shade together

A rejected batch has to trace back to the roll it came off, and most of your process happens at someone else's premises.

  • First phase live in 8 to 12 weeks
  • Deployed by our own engineers
A typical line in textiles
  1. 01Fabric inroll, lot and shade
  2. 02Cuttingthe lot carried onto every bundle
  3. 03Job work outchallan to the job worker
  4. 04Stitchingpieces per operation
  5. 05Checkingrejections traced to the roll
  6. 06Packingsize and colour ratio per carton
Illustrative. Facto is set up with your own steps and names.
01

What should a textile manufacturer look for in an ERP?

Lot and shade held together from greige through to despatch, job work tracked out and back with material reconciled, and a job card quick enough that a floor supervisor still uses it in week five. Work measured in pieces per operation rather than in units produced.

02

Five things that are different in textiles

Each one is true here and not in the other sectors we deploy in, so it changes how the system is set up from day one.

  1. Lot and shade have to survive the whole route

    Greige, dyeing, finishing, cutting, despatch. If the shade identity breaks anywhere along that chain, a rejection cannot be traced back to the roll it came from, and the conversation with the customer becomes a negotiation rather than a fact.

  2. Most of the process happens outside your gate

    Dyeing, printing, embroidery and washing go out to job workers. Material sent, material returned, shortfall and the challan that covers it are the daily reality. A system with no real concept of job work leaves that entire flow on paper.

  3. Work is counted in pieces per operation

    Output per operator per operation per hour is the unit that means something on a stitching line. A job card built for a machine shop's run quantity does not fit, and if the card is slow the supervisor abandons it by week three.

  4. Size and colour matrices multiply everything

    One style becomes dozens of stock keeping units across sizes and colours. Order, cut plan, work in process and despatch all have to hold that matrix without turning into a spreadsheet per style.

  5. Seasonality makes inventory decisions expensive

    Fabric bought for a season that has moved on does not become useful again. Stock ageing against the season, not just against the calendar, is what stops working capital quietly turning into dead rolls.

03

What we configure first for textiles

Live in 8 to 12 weeks
  1. 1

    Production and job tracking

    Pieces per operation per operator, on a job card fast enough that supervisors keep using it after the novelty wears off, with lot and shade carried through every stage.

  2. 2

    Job work management

    Material out and back against a challan, with shortfall visible rather than discovered at reconciliation, across dyeing, printing, embroidery and washing.

  3. 3

    Inventory and stores

    Fabric and trims held by lot and shade with a size and colour matrix, and stock ageing against the season so dead inventory surfaces while it still has some value.

  4. 4

    Quality and traceability

    Inspection against the lot, so a rejected batch traces back to the roll and the process route that produced it.

04

Questions we get in textiles

Can Facto track lot and shade through to despatch?

Yes. Lot and shade stay attached from greige through dyeing, finishing and cutting to the despatch document, so a rejected batch traces back to the roll it came off and the process route it took rather than to somebody's memory.

How does Facto handle textile job work?

Material sent out is recorded against a delivery challan, and what comes back is reconciled against what went. Shortfall is visible as it happens rather than at a quarterly reconciliation, which is when most job work losses are currently found.

Will floor supervisors actually use the job card?

That depends more on speed than on features, which is why the card is built around pieces per operation rather than around a generic run quantity. Adoption is the thing we watch hardest in the first month, and we have written up a rollout where it went slowly at first.